1
Manufacture and delivery of hydro mechanical equipment
Delivery of steel grinding balls d-40 mm
Rushydro branch Saratov HPP
Branch of TGC-3 JSC Cherepets SDPP
2
Delivery of spare parts for mills SH-16, SH-50А
Branch of TGC-3 JSC Cherepets SDPP
3
Installation of a guard shield for foundry shop No. 8
Tyazhmash JSC
4
Supply of spare parts for cranes
Branch of TGC-3 JSC Cherepets SDPP
5
Repair of the exhaust system for shops No. 8, 26 and storm-water drainage for shop No. 3
Tyazhmash JSC
6
Repair of the crane gantry for the foundry shop.
Tyazhmash JSC
7
Overhauls of hydraulic units No. 1, 2
Stage I – Elaboration of design and estimate documentation for overhauls.
Stage II – Overhauls of hydraulic units
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
8
Replacement of trash racks, 70 sections (manufacture, delivery of equipment, disassemble of old equipment, disposal, installation of new equipment, testing)
Branch of Rushydro JSC Nizhny Novgorod HPP
9
Delivery of spare parts for mills SH-16, SH-50А
Branch of TGC-3 JSC Cherepets SDPP
10
Design and performance of overhaul operations with regard to all systems and equipment of Inter gateway HPP (Volgograd)
Design works performed by GEK CJSC
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE

11
Pump station repair.
Syzran TPP JSC
12
Repair and roofing of shops No. 3,5,6,7,8,10,17,30.
Tyazhmash JSC
13
Repair of the storm-water drainage for shops No. 3,5,6,7,8,10,17,30.
Tyazhmash JSC
14
Repair of the frame crane for the metal dump
Tyazhmash JSC
15
Repair and roofing of shops No. 1,2,4,9,11,13, 14,15, compressor plant.
Tyazhmash JSC
16
Comprehensive service including manufacture, delivery, assembly, disassemble and disposal of equipment: gates and trash racks
Branch of Rushydro JSC Saratov HPP
17
Repairs and replacement of the storm-water drainage for shops No. 1,2,4,9,11,13,14, 16,18, compressor plant.
Tyazhmash JSC
18
Repair and construction operations for overhauls of utilities of buildings and structures.
Tyazhmash JSC
19
Repairs of shops No. 5,6,7,13
Tyazhmash JSC
20
Conditions survey of processing and electrical equipment and issue of recommendations for possible reconstruction options with expansion of the hydraulic unit of Inter gateway HPP in Volzhsky
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
21
Delivery of steel grinding balls d-40 mm
Branch of TGC-3 JSC Cherepets SDPP
22
Repair of the turbine and intermediate spindle. Metal ware manufacture.
Branch of Rushydro JSC Nizhny Novgorod HPP
23
Engineering and survey of the covering (roof framing, roofing) of shops No. 8, 10
Tyazhmash JSC
24
Repairs of utility networks and lighting of shops No. 3,5,6,7,17,30.
Tyazhmash JSC
25
Delivery of spare parts for mills SH-16, SH-50А
Branch of TGC-3 JSC Cherepets SDPP
26
Repair of induced draft systems of shops No. 8,10.
Tyazhmash JSC
27
Repair of heat supply stations.
Syzran TPP JSC
28
Replacement of the roof and storm-water drainage of shop No. 6 at a height of 49 m S=3 180 sq.m.
Tyazhmash JSC
29
Project of covering reconstruction at shops No. 8,10
Tyazhmash JSC
30
Repairs of shops No. 5, 12,17 and 88, warehouse
Tyazhmash JSC
31
Repairs of shops No. 5, 6, 26
Tyazhmash JSC
32
Overhauls of the grinder sheave and flywheel
Volgaprommarket LLC
33
Repair and heat insulation of chimneys of shop No. 14
Tyazhmash JSC
34
Welding and assembly of hydroturbine units
Santgudinskaya HPP JSC
35
Manufacture, transportation and installation of 160 m3 water towers.
Ministry of Construction of Samara Oblast
36
Replacement of the process installation equipment.
Repair and installation of processing equipment.
Repair and overhaul of buildings and structures. Roof replacement.
Corrosion protection of tanks
Manufacture and installation of the crane gantry.
Corrosion protection of the crane gantry and platforms.
Reconstruction of off-plot facilities pipelines.
Oil fuel line.
Vacuum diesel fuel line.
Rosneft Joint Stock Company, Syzran Oil Refinery

37
Manufacture and installation of hydro mechanical equipment.
RusHydro JSC, KamHPP Perm
38
Hydro mechanical equipment installation
RusHydro JSC. Nizhny Novgorod HPP
39
Manufacture and installation of the crane gantry
Syzran Oil Refinery JSC
40
Project of overhaul of hydro power equipment of Inter gateway HPP, hydraulic unit 1
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
41
Project of repair and alignment of the hydraulic unit 2 control system, Inter gateway HPP
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
42
Design operations related to repair of compressors and air system as a part of overhauls of hydraulic units No. 1,2 of Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation under the technical design assignment for the development of project "Connection of compressor ZVSH 1,6-3/46 М3 No. 2 to compressor ZVSH 1,6-6/46 М3 No. 1 and CS panel InterHPP"
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
43
Design operations related to repair of compressors and air system as a part of overhauls of hydraulic units No. 1,2 of Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation. Development of project "Connection of compressor ZVSH 1,6-3/46 М3 No. 2 to compressor ZVSH 1,6-6/46 М3 No. 1 and CS panel InterHPP"
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
44
Welding and assembly of hydro turbine units.
Tyazhmash JSC
Boguchanskaya HPP
45
Manufacture and replacement of the STKR rack at Inter gateway HPP
Inter gateway HPP of Volgograd District of Hydraulic Works and Navigation, branch of Volga and Don State Basin Administration of Waterways and Navigation FSE
46
Construction and assembly operations Section 1000 Section 3000
Installation of concrete structures.
Deep oil conversion plant:
Kirishnefteorgsintez PA, Kirishi:
47
Manufacture and replacement of
  hydro mechanicalequipment
RusHydro JSC, KamHPP Perm
48
Hydro mechanical equipment installation
 Rushydro JSC, Nizhny Novgorod HPP
49
Turnkey construction of three TV studios in Moscow
Lyubyanka-Lex CJSC, Moscow
50
Welding and assembly of hydro turbine units
Tyazhmash JSC
Zagorskaya HPP
51
Office complex reconstruction, Moscow
Lyubyanka-Lex CJSC, Moscow
52
Metalwork corrosion protection
Deep oil conversion plant:
Kirishnefteorgsintez PA, Kirishi:
53
Construction and assembly operations Section 1000 Section 3000
Installation of concrete structures.
Deep oil conversion plant:
Kirishnefteorgsintez PA, Kirishi:
54
Holiday home reconstruction
Lyubyanka-Lex CJSC, Moscow
55
Manufacture and installation of hydro mechanical equipment.
RusHydro JSC, KamHPP Perm.
56
Manufacture and installation of hydro mechanical equipment.
RusHydro JSC, KamHPP Perm
57
Construction and installation works Section 1000 Section 3000.
Deep oil conversion plant:
Kirishnefteorgsintez PA, Kirishi
58
Metalwork corrosion protection.
Deep oil conversion plant:
Kirishnefteorgsintez PA, Kirishi
59
Installation of concrete structures.
Deep oil conversion plant
Kirishnefteorgsintez PA, Kirishi
60
Turnkey construction of a production complex. stage 1.
St. Petersburg, SPS
61
Shopping mall overhaul.
Lyubyanka-Lex CJSC, Moscow